Will the Vending Machine Fit Through the Door? Check the Route
A vending machine can fit comfortably in a break room and still face a difficult delivery route. The entrance, corridor turn or final doorway may be the limiting point. Give the supplier a route record before the delivery date, and let the delivery team confirm the handling method and clearances.

Use the actual supplied configuration
Ask for the dimensions and weight of the exact machine being delivered, including relevant packaging and fitted accessories. Do not use a general “standard vending machine” size. Confirm whether a published dimension describes the cabinet alone or the item as transported.
Manufacturer pages such as SandenVendo’s G-Snack Evolution range distinguish configurations. The range name alone is therefore not your delivery specification. Your supplier should provide the information for the ordered version and explain any preparation needed.
Walk the route from unloading to position
Record the unloading location, entrance, each doorway, corridor, turn and final approach. Measure the clear opening available with the door in its permitted open position. Include obstructions such as handles, door closers, thresholds and low fittings rather than recording only the frame dimensions.
Photograph each constraint with a location note so measurements cannot be assigned to the wrong door. A rough floor plan with numbered photographs is often easier to discuss than a folder of unlabelled pictures. If access changes during building work, tell the supplier before delivery.
Flag lifts, steps and restrictions early
Record any steps, slopes, lift doors and lift-cabin dimensions. Obtain the building’s confirmed lift capacity and booking arrangements; the delivery team must assess the full load and handling equipment. Do not assume a goods lift is suitable merely because other heavy equipment has used it.
Include permitted delivery hours, security access, parking arrangements and floor-protection requirements. Keep these logistics separate from instructions on moving the machine. Tilting, lifting or removing parts requires the supplier’s approved method, not an improvised solution at the doorway.
Get the route accepted before booking
Send the route record to the supplier and ask which points need an on-site inspection. Resolve missing measurements and identify the person who will meet the delivery team. Also confirm that the final position provides the required operating and service space.